Project info

  • Client: River Oaks Country Club
  •  Time Frame: 4 Weeks 
  • Location: Houston, Tx.

When the historic River Oaks C.C. needed repairs done to their facilities; only the keen attention to detail of Division 9 could get the job done correctly and efficiently.

In the men’s locker room we installed, sanded and finished a bold mesquite wood floor. A lighter wood in a herringbone pattern was chosen for the wine room as well as the women’s locker room. Thresholds needed to be fabricated and stained to match in all of the rooms.

After years of use made the carpet lose, Division 9 replaced the old carpet and pat to restretch and rejuvenate the hallways.